Area D – Resident Area and B – Day Care Area from SE - Jun2008

  • Area D – Resident Area and B – Day Care Area from SE - Jun2008 image
  • Resident Main Entrance – Area B - Jun2008 image
  • Area A – Setting Glu-Lam Beams - Jun2008 image
  • Roof Sheathing Area C - Jun2008 image
  • Area A, Administration & Food Service & C, Resident Area - Jun2008 image
  • Framing Area C - Jun2008 image
  • Dining Room Trusses - Jun2008 image
  • Trellis Columns - Jun2008 image
  • Fire Water Connection - May2008 image
  • Plating - May2008 image
  • Curbs and Gutters - May2008 image
  • Framing & Trusses - Area C - May2008 image
  • Site Pre Framing - May2008 image
  • Commencement of Framing - May2008 image
  • Site Electrical - May2008 image
  • Framing & Trusses – Area B - May2008 image
  • Catch Basin - Apr2008 image
  • Entrance from West Avenue I - Apr2008 image
  • Loading Dock - Apr2008 image
  • Grease Interceptor - Apr2008 image
  • Entrance from 30th Street West - Apr2008 image
  • Column adjacent to Fireplace - Apr2008 image
  • Storm Drain Sump Pump - Apr2008 image
  • Grading Curbs - Apr2008 image
  • Loading Dock Retaining Wall Foundation - Mar2008 image
  • Preparing Water Connection to City Main - Mar2008 image
  • Wall Layout and Plates - Mar2008 image
  • Installing Storm Drains - Mar2008 image
  • Rough Grading - Mar2008 image
  • Laying Out Walls - Mar2008 image
  • Pedestals for Trellis Columns - Mar2008 image
  • Loading dock Retaining Walls - Mar2008 image
  • West Masonry Wall - Feb2008 image
  • Erosion control Cloth under Plastic Vapor Barrier - Feb2008 image
  • Concrete at Area D - Feb2008 image
  • Concrete at Area B - Feb2008 image
  • Sewer Connection - Feb2008 image
  • Rebar at Area D - Feb2008 image
  • Area B protected from Rain - Feb2008 image
  • Steel Column Installation complete - Feb2008 image
  • Footing framing for Area B - Jan2008 image
  • Rebar at Area C - Jan2008 image
  • Slab concrete pour at Area C - Jan2008 image
  • Frozen rainwater - Jan2008 image
  • Applying sand base before rebar - Jan2008 image
  • Electrical Room stub-ups at Area D - Jan2008 image
  • Finishing concrete slab - Jan2008 image
  • Pumping water out of foundations - Jan2008 image
  • Street Sewer Manhole Safety Shoring - Dec2007 image
  • Underslab on Grade Baserock Compaction - Dec2007 image
  • Mechanical Room Chiller Feed Lines - Dec2007 image
  • Slab Concrete Pour - Dec2007 image
  • Area A Slab on Grade Concrete Pour - Dec2007 image
  • Underslab on Grade Vapor Barrier - Dec2007 image
  • Underslab on Grade Rebar Placement with Plumbing Blockouts - Dec2007 image
  • Area A Slab on Grade - Dec2007 image
  • Fire main backflow prevention systems - Nov2007 image
  • Sewer Main tracer line - Nov2007 image
  • Underslab plumbing - Nov2007 image
  • Slab on grade footing pour - Nov2007 image
  • Storm drain riser and lateral - Nov2007 image
  • Domestic water backflow prevention system - Nov2007 image
  • Finished footings - Nov2007 image
  • Underslab electrical - Nov2007 image
  • Rebar Delivery for Slab On Grade Footings - Oct2007 image
  • Main Storm Drain Manhole Installation - Oct2007 image
  • Slab On Grade Footing excavation - Oct2007 image
  • Santa Ana Winds - Oct2007 image
  • Slab On Grade Footing Formwall with Water Stop - Oct2007 image
  • Fire Hydrant Vertical knockoff riser with valve - Oct2007 image
  • Slab On Grade pad survey certification - Oct2007 image
  • Security fence after Santa Ana winds - Oct2007 image
  • Installation at Y-Joint - Sep2007 image
  • Sanitary Sewer Trench Compaction - Sep2007 image
  • Storm Drain Installation - Sep2007 image
  • Sanitary Sewer Riser Encapsulation - Sep2007 image
  • Thrust Block Preparation - Sep2007 image
  • Sanitary Sewer Riser Stablization - Sep2007 image
  • Storm Drain Laterals - Sep2007 image
  • Finished Matt Slab - Sep2007 image
  • Jobsite Trailers - Aug2007 image
  • Engineered Fill Being Placed - Aug2007 image
  • Engineered Fill Compaction - Aug2007 image
  • Electronic Survey Device - Aug2007 image
  • IOR Inspector - Aug2007 image
  • Access Road Development - Aug2007 image
  • 14 Cubic Yard Engineered Fill Delivery Trucks - Aug2007 image
  • 3' Engineered Fill For Matt Slab - Aug2007 image
  • Filled Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
  • Empty Dot Image
Area D – Resident Area and B – Day Care Area from SE - Jun2008 image